Search This Blog

Showing posts with label continual improvement. Show all posts
Showing posts with label continual improvement. Show all posts

Tuesday, 4 September 2012

Monday, 9 July 2012

Testing your emergency environmental planning arrangements

Is your organisation is responsible for storing and transporting materials that could cause pollution if they leak or are spilt, such as

•       diesel

•       oil

•       chemicals?

 

If so have you prepared an environmental incident response plan?

 

I’ve been working a construction client in this area to reduce their risk and meet the requirements of ISO 14001:2004.

 

You may want to carry out and emergency response planning exercise which can cover:

  • identifying sources of pollution
  • causes of spillages
  • internal procedures for spill management
  • responsibilities on site for spill control
  • equipment for spill control
  • managing spills
  • the subsequent clean up.

 

Testing the plan can take the form of:

  • deploying spill equipment to show staff what to do under controlled conditions
  • do a desk top exercise where a spill scenario on a site is discussed by staff, with in a group or one to one 

 

Items included in your exercise will be site specific but can include typically:

  • Identify the location and type of site drains from both drawings & on site information
  • Review your site drainage plan
  • Review then brief staff to chemicals and substances on site including COSHH requirements
  • Use of diesel plant and plant nappy/drip dray use
  • Security risk of keeping fuel on site and how to prevent theft
  • Review and brief staff on refuelling & chemical use, plus confirm authorisation to do so
  • After checking contents, brief staff to location and type of spill kit on site
  • Review and brief staff on arrangements for safe and compliance disposal of used spill kits as hazardous waste

 

 

Don’t forget to create a record of what was discussed and who attended. 

 

For work with my client, I’ve videoed one spill response test session in order to make a training video for them. So, there are lots of ways, but please ensure that you know your environmental risks, minimise them and prepare for the unexpected as spills and leaks can

  • cause environmental damage which can result in prosecution
  • lead to civil claims
  • give loss of reputation
  • affect you winning work

Wednesday, 27 June 2012

The good case for saving energy on a construction sites

I'm noticing recently a slow improvement of energy saving measures on construction sites.  For example I've attached a photograph of a sensor activated hot water tap. Many clients ask for energy saving examples, so please explore the options when ordering site accommodation for energy saving measures such as light sensors, timers for heating, alternative heating sources (to diesel) and LED lighting.

P1010010
cl

Tuesday, 29 May 2012

We are delighted to have won the #SmartSocial Award incentive on Twitter run by @MarketmeTV

The DIEMLtdTV video channel on YouTube at www.youtube.com/diemltdtv has helped us win a Smart Social Award. We both enjoy making these videos and feel it helps us give something back to the global business community.

Making videos can be done with an ordinary digital camera which has video mode and software you can get free with a PC. Why not give it a go.

Videos can also be used for site inspections as well as communicating, so why not give it a try. Please get in touch if you need help with this.

Template_winner_logo1

Friday, 20 April 2012

ISO 14001 - get the basics right & the rest will follow

When I with clients being audited for ISO 14001 I pay very good attention to the auditor. This is mainly as a lead EMS auditor I'm interested in seeing how other auditors work, but secondly I'm fascinated about the differences between auditors.

However, what doesn't change is that the have to audit against the clauses of the standard.

Personally, when writing an EMS I like to keep it simple and follow the organisation of the clauses of the standard. I speak to colleagues who look at the activities carried out by the organisation and write the EMS to those. We all must be right if our clients are getting through ISO 14001 accredited certification.

What I have noticed with external auditors that if the EMS manual is in the same order as the standard's clauses, then it's easy for them to follow and can find parts of the manual if only auditing certain clauses of the standard.

I also believe in keeping it simple as all you have to do is meet the minimum requirements of the standard. Now, this sounds defeatist, but being pragmatic you want to meet the requirements as a minimum as diversions into other avenues may distract you from meeting the basic requirements...of the standard you are being audit against.

Often I hear people starting out or thinking of starting ISO 14001 that CSR or sustainability can drive it. Whilst they can, I think get the basic systems and legal requirements right and the rest will follow.

Thursday, 9 February 2012

Real environmental KPIs (and not massaging imaginary figures!)

Recently I’ve been doing quite a lot of work with clients to set and monitor environmental KPIs. The actual requirements of ISO 14001:2004 for this are driven by clauses 4.5.1 Monitoring and measurement and 4.3.3 Objectives, targets & programme(s) but it can deliver requirements for: 

 

  • 4.3.2 Legal and other requirements eg by meeting client requirements and some legal requirements in implementing the waste hierarchy under the Waste (England & Wales) Regs 2011
  • 4.4.4 Documentation/4.5.4 control of records eg KPI records can demonstrate effective planning and operation control
  • 4.4.6 Operational control eg KPIs can deliver hard facts to demonstrate control such as waste being diverted from landfill or reduction in carbon
  • 4.5.2 Evaluation of compliance eg any legal consents which have to be measured, such as noise or water sampling can have set KPIs set by the regulator
  • 4.6 Management review eg KPIs for hard evidence to demonstrate problems or continual improvement.

 So, when setting KPIs think about the goal and what you can achieve, rather than doing it for the sake of it.