Search This Blog

Showing posts with label EMS. Show all posts
Showing posts with label EMS. Show all posts

Tuesday, 4 September 2012

Thursday, 26 April 2012

SWMP - not dead yet

The word on the street is that Site Waste Management Plans (SWMP), which are statutory waste management plans for construction projects in England, however they are still with us.

I'm not going into details of SWMP and details can be found at

http://www.environment-agency.gov.uk/netregs/businesses/construction/62359.aspx

but I'm undecided whether they should end.

On the side who wants rid of SWMPs, their diabolically poor implementation by the previous government, meant that they were a good idea badly implemented. They now have seemed to vary in quality and accuracy across projects which is a shame as they are useful, but they have lost their way and maybe it's time for a new start.

When they were brought out, I attended many (state funded) training sessions which were very poor in quality. Also, they were attended by environmental professionals in the main not estimators, quantity surveyors, designers, project managers and the like. People who cost, agree and drive projects from their conception.

SWMP if done right, ie start at the design phase, have been proven to save projects money, but their mandatory nature can make them a formality instead a chance to save money and identify waste minimisation opportunities starting at design.

They are not dead yet, so why not rethink their potential.

Thursday, 9 February 2012

Real environmental KPIs (and not massaging imaginary figures!)

Recently I’ve been doing quite a lot of work with clients to set and monitor environmental KPIs. The actual requirements of ISO 14001:2004 for this are driven by clauses 4.5.1 Monitoring and measurement and 4.3.3 Objectives, targets & programme(s) but it can deliver requirements for: 

 

  • 4.3.2 Legal and other requirements eg by meeting client requirements and some legal requirements in implementing the waste hierarchy under the Waste (England & Wales) Regs 2011
  • 4.4.4 Documentation/4.5.4 control of records eg KPI records can demonstrate effective planning and operation control
  • 4.4.6 Operational control eg KPIs can deliver hard facts to demonstrate control such as waste being diverted from landfill or reduction in carbon
  • 4.5.2 Evaluation of compliance eg any legal consents which have to be measured, such as noise or water sampling can have set KPIs set by the regulator
  • 4.6 Management review eg KPIs for hard evidence to demonstrate problems or continual improvement.

 So, when setting KPIs think about the goal and what you can achieve, rather than doing it for the sake of it.